The Coca-Cola Long An plant is currently Coca-Cola’s most modern and significant investment project in Vietnam, marking a strategic shift from Ho Chi Minh City to the Long An region.
General Information
- Location: Phu An Thanh Industrial Park, An Thanh Ward, Ben Luc District, Long An Province.
- Area: 19 hectares (nearly double the size of the old Thu Duc facility).
- Total Investment: 136 million USD (over 3,500 billion VND).
- Design Capacity: Reaches over 1 billion liters of product per year at full operation.
Key Milestones
- Groundbreaking: October 14, 2022.
- Inauguration: July 11, 2025 (Officially commenced operations).
- Operational Transition: This plant took over all production lines and personnel from the Hanoi Highway facility (Thu Duc City) after that site ceased operations in late September 2025.
Highlights
- Smart Technology: Implements digital manufacturing management and high automation to optimize costs and quality.
- Green Factory: Aimed at sustainability standards, utilizing rooftop solar energy, advanced wastewater treatment systems, and prioritizing recycled packaging materials.
- Strategic Location: Situated at the “gateway” connecting Ho Chi Minh City with the Mekong Delta provinces, shortening transport times and optimizing the supply chain for the Southern region.
