Long Thanh International Airport is a key national infrastructure project aiming to become one of the major aviation hubs in Southeast Asia. Tai Sin Electric Cable is proud to provide electrical solutions for this mega-project, demonstrating our commitment to durable quality and meeting the most stringent technical requirements in the global aviation industry.

General Information
- Location: Long Thanh District, Dong Nai Province (approx. 40km from HCMC).
- Project Scale: Phase 1 includes 1 runway, 1 passenger terminal, and synchronized auxiliary facilities.
- Total Investment: Approximately $4.6 Billion USD (over 110,000 billion VND) for Phase 1.
- Design Capacity: 25 million passengers and 1.2 million tons of cargo per year.
- Technical Standards: Compliant with ICAO standards (Category 4F – the highest), international IEC and BS standards, and specialized electrical safety regulations for aviation infrastructure.
Key Milestones
- Groundbreaking: January 2021 (Land clearance) and August 2023 (Passenger terminal).
- Projected Completion: Currently under peak construction, with operations expected to begin in 2026.
Project Highlights
- National Landmark Infrastructure: The most significant transport project in Vietnam, driving economic growth in the Southern Key Economic Region.
- International 4F Standard: Capable of handling the world’s largest wide-body aircraft, such as the Airbus A380 and Boeing 747-8.
- Iconic Architecture: The passenger terminal is inspired by the lotus flower, integrated with the world’s most advanced airport management technologies.